Egersund Wind Park, Rogaland area, Norway

  • Tipologia costruzione:
  • Settore energia
Schermo intero Chiudi

Peikko Group’s Norwegian subsidiary Peikko Norge AS delivered Rock Anchor Foundation Technology to Egersund wind park, which is located at Eigersund municipality in Rogaland county, south-western part of Norway.

 

Peikko was responsible for the foundation design with the structural calculations and delivered all of the steel components to 33 wind turbine foundations. The deliveries included FATBAR rock anchors, tower adapter plate with tower flange connection bolts, drilling templates- and assembling system, special reinforcement steel technology.

The wind park has been developed by Norsk Vind Energi AS, and their project investor is Luxcara GmbH. Egersund wind park is the second wind project in Norway, to utilize the technology of the Peikko Rock Anchor Foundation. The wind park was completed and officially put ino operation in May 2018.

The general contractor was Veidekke ASA, which also carried out the technical assembly of steel components and casting works of the Peikko Rock Anchored Foundations. Senvion delivered 33 of their 3.4MV-114 turbines with hub heights of 93 meters.

Leggi tutto down-arrow.png

We want to be in the forefront of development, which means utilizing new technologies in our projects. Peikko’s Rock Foundation offers the best solution for Egersund.

Helge Furuset, Purchasing Manager at Veidekke ASA

Informazioni sul progetto

Investitore:
Norsk Vind Energi A/S
Impresa di costruzioni:
Veidekke ASA / B&G Entreprenør AS
Strutturista:
Peikko is also responsible for the structural calculations associated to the design of the Rock Anchor Foundations
Anno della fornitura:
2016-2017
Fine lavori:
2017
Numero di aerogeneratori:
33
Produttore aerogeneratore:
Senvion
Potenza della turbina, MW:
3.4MV-114
Altezza torre, m:
93

Ulteriori informazioni

Contacts

Gunnar Moen, Cellulare +47 974 19 888
Back to reference search